    山区坡面型泥石流形成条件与防治技术研究

    Formation conditions and prevention-control technologies of slope-type debris flows in mountainous areas

    • 摘要: 山区坡面型泥石流具有突发性强、无明显流通区、成灾迅速等特点,其形成条件与防治技术是防灾减灾研究的关键。以西南山区某典型流域为研究对象,基于野外调查、室内试验与长期监测数据,系统分析了坡面型泥石流的地形、物源与水源三要素耦合机制,并提出了定量化的形成条件阈值。研究表明:地形上需坡度20°~40°,高差集中且无独立流通区,利于势能快速转化;物源上要求松散堆积物厚度不小于0.5 m,天然密度1.65至1.85 g/cm3,内摩擦角25°~32°,黏聚力5~15 kPa,下伏基岩透水性差易形成滞水带;水源上以短时强降雨为直接触发因素。在此基础上,构建了基于前期降雨量与短历时强降雨的加权耦合预警模型,并根据模型计算值划分蓝、黄、红三级预警阈值。针对性设计了一套"源头削减、路径调控、末端防护"的综合工程防治措施:在物源区修建重力式拦沙坝,布设截排水沟与植被固土带。实例应用结果显示:防治后8个地表位移监测点的月均位移量由6.8 mm降至1.2 mm,下降幅度达82%;最大累计位移由87 mm降至18 mm,下降79%;降雨监测系统平均绝对偏差为0.11 mm;拦沙坝年均拦蓄固体物质960 m3;预警系统平均提前42 min发出警报。该技术体系集成了监测-预警-应急处置的闭环防灾流程,为山区坡面型泥石流防治提供了可量化的技术参考。

       

      Abstract: Mountain slope-type debris flows are characterized by high suddenness, no distinct transport zone, and rapid hazard initiation. Understanding their formation conditions and developing control technologies are key to disaster prevention and mitigation. Based on field surveys, laboratory tests, and long-term monitoring data from a typical catchment in Southwest China, this study systematically analyzes the coupling mechanism of the three controlling factors, topography, source material, and water trigger, and proposes quantitative thresholds for formation conditions. The results show that: topographically, slope gradients of 20°-40° with concentrated relief and no independent transport zone facilitate rapid potential energy conversion; regarding source material, loose deposits with a thickness of no less than 0.5 m, natural density of 1.65-1.85 g/cm3, internal friction angle of 25°-32°, cohesion of 5-15 kPa are required, and the underlying bedrock with poor permeability tends to form a perched water zone; hydrologically, short-duration heavy rainfall serves as the direct trigger. On this basis, a coupled early warning model integrating antecedent rainfall and short-duration heavy rainfall is constructed, and three warning levels (blue, yellow, and red) are defined according to the model output. A comprehensive engineering control strategy of "source reduction, path regulation, and terminal protection" was designed, including gravity check dams in the source area, as well as drainage ditches and vegetation reinforcement. Application results show that after treatment, the average monthly displacement at eight surface displacement monitoring points decreased from 6.8 mm to 1.2 mm (an 82% reduction); the maximum cumulative displacement dropped from 87 mm to 18 mm, (a 79% reduction); the mean absolute deviation of the rainfall monitoring system is 0.11 mm; the check dam retains 960 m3 of solid material annually; and the early warning system provides an average lead time of 42 minutes. This technology system integrates a closed-loop disaster prevention process of monitoring, early warning, and emergency response, providing a quantifiable technical reference for the prevention and control of slope-type debris flows in mountainous areas.

       

    /

    返回文章
    返回